PHASER

Methods & sources

  1. 1,000× less energy per step. Modeled, not built (Exp. 29, research/2026-09-14). One step of a 135,000-neuron dense layer: a GPU at 2 pJ per multiply–accumulate uses 36.6 mJ; PHASER on one 1080p modulator at 32 optical modes per neuron uses 0.037 mJ. Across 4–32 modes per neuron and layer sizes that fit one modulator the modeled gap is 490× to 31,000×. At today's simulated scale (4,096 modes) PHASER only matches an equally good digital system, and it has no advantage over sparse layers.
  2. 2 pJ vs 0.002 pJ per multiply. Same model, same step: 36.6 mJ (GPU) and 0.037 mJ (PHASER) divided by the 1.83 × 10¹⁰ multiply–accumulates of one step of a 135,000-neuron dense layer. The field renderings are illustrations: a Gaussian light packet in vacuum, and a Bloch electron packet scattering in a diamond-cubic lattice.
  3. 6.7 ns per step. Simulated: the modeled ring has a 200 mm round-trip path (0.667 ns), drawn here folded between two mirrors 10 cm apart; one step is 10 round trips.
  4. 10 B steps per second. Modeled: each wavefront completes a step every 6.7 ns (≈150 M steps/s). With 100 GHz modulators and detectors, wavefronts can be spaced 10 ps apart, so 0.667 ns / 10 ps ≈ 67 are in flight at once; 67 × 150 M ≈ 10 B steps/s. Assumes the gain medium and detectors keep up and that wavefronts do not cross-talk.
  5. Denoising pass. Illustration of a programmed pass: one deterministic diffusion step, xt−1 = x0 + (σt−1/σt)(xt − x0), for a model whose data is a single image. It shows what a pass computes; it is not a simulation of the optics.
  6. 128 weeks. Wood Mackenzie (Aug 2025): power-transformer lead times of about 128 weeks in Q2 2025.
  7. 5 years+. Lawrence Berkeley National Laboratory, Queued Up (2026 edition): the median time from grid-interconnection request to operation is over 5 years.
  8. $400 B+. IEA, Energy and AI (Apr 2025) and its 16 Apr 2026 update: the five largest tech companies spent over $400 B in 2025.
  9. Footage. Real b-roll from Pexels (Pexels License), Mixkit (free licence) and the US Senate Committee on Energy and Natural Resources (public domain). "SuperMUC: First Commercial Hot-Water Cooled Supercomputer to Consume 40% Less Energy" by IBM Research, CC BY 3.0, via Wikimedia Commons (excerpt, re-encoded)
  10. The machine. The hero is a live 3-D wave simulation (FDTD) of a pinhole-fed cavity with seven phase-plate modulators, slowed about 2.7 billion times.
← PHASERλ 650 nm